Durable Objects duration overage is rounded up to the next million GB-s
FlareCost points out that on Workers Paid, Durable Objects duration beyond the included 400,000 GB-s is rounded up to the next million GB-s before the $12.50 rate applies, so 500,000 GB-s over is billed as 1 million: $12.50, or $17.50 with the $5 minimum. Cloudflare’s pricing page states the same rounding.
- Products
- Durable Objects
- Source
- Community resource𝕏 post
- Author
- FlareCost
Key points
- Example from the post: 900,000 GB-s used, 500,000 over the included amount, billed as 1 million GB-s = $12.50, or $17.50 with the $5 Workers Paid minimum.
- The Durable Objects pricing page read on 2026-11-04 says billable usage per metered dimension is rounded up to the next billable unit before the rate is applied, giving the example of 500,000 GB-s rounded up to 1,000,000 GB-s; duration is 400,000 GB-s a month included, then $12.50 per million GB-s.
- A user bill thread from @happyjiahan on 2026-10-30 describes the same effect: about 3.06 million GB-s over billed as 4 million, $50.
- FlareCost describes itself as an independent cost estimator not affiliated with Cloudflare.
Original sources
Published
Original post
Read on 𝕏FlareCost points out that on Workers Paid, Durable Objects duration beyond the included 400,000 GB-s is rounded up to the next million GB-s before the $12.50 rate applies, so 500,000 GB-s over is billed as 1 million: $12.50, or $17.50 with the $5 minimum. Cloudflare’s pricing page states the same rounding.
FlareCost
@FlareCost · Original 𝕏 post
Durable Objects on Workers Paid: 400,000 GB-s of duration included, then $12.50 per million GB-s, and billable GB-s round up to the next million. Use 900,000 GB-s and the 500,000 over is billed as 1M: $12.50, or $17.50 with the $5 minimum. https://t.co/Wlp9OozMXm
User bill thread from @happyjiahan: Durable Objects overage of about 3.06 million GB-s was billed as 4 million, exactly $50; R2 operation overage is also rounded up per million.
Read on 𝕏Han
@happyjiahan · Original 𝕏 post
贵的原因主要是: * DO 等待下载也可能计时。 字体下载代码为每个字体创建 DO,由它执行下载、等待 R2;费用按对象活跃时间计算,CPU 使用少也可能收费。 * 计费向上取整。 DO 超额约 306 万 GB·秒,按 400 万计费,正好 $50。R2 超额操作也按百万次取整。 * R2 贵在操作次数。 存储容量本身仅 $0.29
FlareCost guide page linked from the post.
Open original source
More to read
stevesprompt: an agent clicked Upgrade in the Cloudflare dashboard and charged $1.5k; the money was refunded.
X user @stevesprompt (Steve Huang) says an agent clicked Upgrade in his Cloudflare dashboard and he was charged $1.5k, and that the money was luckily refunded. The author then lists precautions before an agent can spend money or send anything. The post does not name the product that was upgraded. There is no official public Cloudflare response in the thread.
Anti-abuse code that burned the Durable Objects allowance: heartbeats, rejected requests and D1 scans
Frank Zeng (@frankzeng2020) says an AI-written anti-abuse module pushed Durable Objects to 1.19 million requests against the 1 million included each month, costing him an extra $0.15; a budget alert email caught it, and the audit also found a D1 query path scanning 925 million rows a day and a signing key re-imported on every request. He shares a read-only self-audit prompt.
Feng Yi: After Observability is billed by write volume, capture all errors and sample only 1%–10% of successful requests; put the body in R2 and set a 7-day expiry
On 2026-11-20, X user @Michael_liyang (Feng Yi), replying to @AdrianPunk115's reminder that from 1 December logs and request tracing will be billed by the volume of data written and stored, wrote: once billing is by write volume, this will change to "capture all errors and sample 1%–10% of successful requests"; a trace keeps only request_id/route/status/duration, and the raw body and prompt go in R2 with a 7-day expiry. The author cautions: estimate bytes written per day before launch, and don't wait for the bill to find that tracing costs more than the business.